Please download the Luas Cross City Alignment Drawings

O’Connell Bridge works – August bank holiday weekend 2016

 

Luas Cross City Red Line Tie In Works – Marlborough St / Abbey St Junction 

3 minute time-lapse video

12 minute time-lapse video

Luas Cross City Red Line Tie In Works – O’Connell St / Abbey St Junction 

3 minute time-lapse video

12 minute time-lapse video

 

Luas Cross City New Bridge Construction – Broadstone February 2016 – Time-lapse 

Fassaugh Road Bridge Deck Replacement

Luas Cross City works commenced at Fassaugh Road Bridge 26th July. The works involved the installation of new foundations and abutments for the new bridge deck.

The second phase of the works involved the new deck being constructed adjacent to the existing structure on a temporary supporting structure. Once the new deck was ready the existing deck was removed and the new deck slid into position.

 

Broadstone Cutting

Preliminary works have commenced along the alignment of the Broadstone Railway Cutting.

Sisk Steconfer Joint Venture (SSJV) have now started work on those sections of the Railway Cutting which have not already been cleared by earlier works. These current works will involve investigation, top soil removal and site clearance.
Works will then continue in this area and all along the route until the line goes into operation in 2017.

Site Clearance Photo

 

Main Infrastructure Works Contract

Main Infrastructure works commenced in July 2015 and are on-going at the following locations:

* O’Connell Street;

* Westmoreland Street;

* College Street;

* College Green;

* Grafton Street Lower;

* Nassau Street;

* Dawson Street; and

* St. Stephen’s Green North

In addition, minor works and night works are being undertaken along the Luas Cross City route as necessary. See also the news section of the website for traffic management and other updates.